YEAR
|
DESCRIPTION
|
2002
- 2008
|
Flow
station in-plot piping and leak repair, SHELL PDC Eastern Division.
Construction
and Replacement of flow lines, SHELL-PDC Eastern Division.
D e – Sanding and Vessel Entry
services at Obigbo North Flowstation
Modification of Obigbo North flowstation
8’outlet line.
Sectional repair of Afam 4’’ flowline
and hydrotest.
Clamping of buseni
well 4, 4’’ outlet flowline.
Modification of obigbo north flow station discharge pumps support lines.
Construction/replacement of obigbo north well 24 S flowlines
and pressure test.
Construction/Replacement of Obigbo North well10T flowlines
and pressure test.
Repair and Modification of Afam flowstation flare line.
|
2009
|
CAKASA
COMPANY NIGERIA
|
|
Calibration
and certification of pressure recorders, gauges and vacuum gauges.
Construction
and Pressure testing of NAOC – OB/OB gas arrival manifold.
Pressure
testing and certification of high pressure hoses and spools.
|
2009
|
LTT
OIL & GAS
|
|
Design
and Construction of PSV Pneumatic Test Bench used for :
Calibration
and Certification of Pressure Relief Valves (PSV) onboard DWD – Trans Ocean
Deep Water Drilling Rig.
Calibration
and Certification of ITT Barton Recorder – Pressure, Temperature and
Differential pens.
|
2010
|
LTT
OIL & GAS
|
|
Calibration
and Certification of Pressure Relief Valves (PSV) onboard PATHFINDER – Trans
– Ocean Deep Water Drilling Rig.
Testing
and Certification of (SSSV) Sub Surface Safety Valve – Halliburton Testing
Services.
Calibration
and Certification of Pressure Relief Valves (PSV) on board MV Loving Tide – Tidex Nigeria Limited.
|
2010
|
TENARIS
GLOBAL SERVICES
|
|
Fabrication
of polyurethane rubber seals for large threading.
Construction
of barriers in production area.
Fabrication
and Construction of Walkway Bridges
|
2010
|
CAKASA
COMPANY NIGERIA
|
|
Calibration
and Certification of Pneumatic PSV Test Bench Gauges.
Hydrostatic
testing and Certification of high pressure hoses and spools.
Testing
and Certification of 4” X 600 Pneumatic Control Valve.
|
2011
|
LTT
OIL & GAS
|
|
Calibration
and Certification of Pressure Relief Valves (PSV) onboard GSF JACKRYAN –
Trans Ocean Deep Water Drilling Rig.
Calibration
and Certification of Pressure Recorders and Gauges.
|
2011
|
TENARIS
GLOBAL SERVICES
|
|
Fabrication
and Construction of Donabat and Maesak
link Walkway Bridges.
Construction
of a Wooden Table Top Clamp.
|
2011
|
B.G.TECHNICAL
|
|
Maintenance
of Pressure Recording and Monitoring Instruments/
Calibration
and Certification of ITT Barton recorders- pressure, temperature.
Provision
of ITT Barton and Pressure gauges rental services.
|
|
Maintenance
of Pressure Recording and Monitoring Instruments/
Calibration
and Certification of ITT Barton recorders- pressure, temperature.
Provision
of ITT Barton and Pressure gauges rental services.
|
2012
|
LTT
OIL & GAS
|
|
Calibration
and Certification of Pressure Relief Valves (PSV) onboard M.G. HULME – Trans
Ocean Deep Water Drilling Rig.
Calibration
and Certification of ITT Barton Recorder – Pressure, Temperature and
Differential pens.
Calibration
and Certification of Pilot Relief valve.
Maintenance
and repair of pneumatic test pump.
|
2012
|
TENARIS
GLOBAL SERVICES
|
|
Construction
of 2” galvanizes pipe barriers around production area.
Maintenance
and servicing of pneumatic pressure regulators.
Modification
and repair of machine shop drain system.
|
2013
|
CAKASA
COMPANY NIGERIA
|
|
Calibration
and Certification of PSV Pneumatic test bench gauges.
Calibration
and Certification of air compressor vacuum gauges.
|
2013
|
LTT
OIL & GAS
|
|
Calibration
and Certification of Pressure Relief Valves (PSV) onboard ABO FPSO PROSAFE
Production Platform – Nigerian Agip Energy NAE.
Visual
Inspection of Production Facility during shutdown and Valve Maintenance and
Repair.
Desanding Services, Vessel Entry,
Calibration and Certification of PSV, PG, and Testing Services.
|
2014
|
AOS
ORWELL
|
|
Calibration
and Certification of FISHING Gauges
Calibration
and Certification of WIRELINE Gauges.
Calibration
and Certification of MACHINE Gauges.
Calibration
and Certification of Pressure Control Gauges.
|
2014
|
CENTURY
ENERGY SERVICES
|
|
Maintenance
and repair of KLINGER WATER LEVEL SIGHT GLASS and replacement of glass in
required torque application.
Test
and Certify Klinger Water Level Sight Glass for proper functional operations.
|
2015
|
BELL
OIL AND GAS
|
|
Fabrication
and Construction of 1” Air line and 2” Vacuum
Ducting lines in spooling workshop.
Calibration
and Certification of Thermo-couple elements, ITT Barton and Pressure gauges.
Modify
and test air ducting pipes.
|
2015
|
AOSORWELL.
|
|
Inspection
and Certification of Air Compressors.
Installation
of Electrical control panel, pressure control switch and gauges on
compressors.
Calibration
and recertification of high pressure recorders and gauges in all departments.
|
2016
|
AOSORWELL
|
|
Calibration
and certification of Machine Shop Gauges, Down Hole Tool Gauges and
inspection Air Compressors.
Provision
of UT measurement on diesel storage tanks,
Diesel
storage facility modification, repair and pressure test .
|
2016
|
LTT
OIL & Gas
|
|
Calibration
and certification of Pressure Relief Valves.
|
2016
|
AOS
ORWELL
|
|
Calibration
of Pressure Transmitter in Pressure Relief Test Bench.
Calibration
and certification of safety valve test bench transmitters and test gauges.
Calibration
of Pressure Control Department Pressure Recorders and Gauges
|
2016
|
CAKASA
NIGERIA COMPANY
|
|
Pressure
Testing and Certification Uremu Flowstation
Spools
Pressure
Testing and Certification of Uzere Flowstation Spools
Pressure
Testing and Certification of Afiesere Flowstation Spools.
|
2016
|
CHEVRON
NIGERIA LIMITED
|
|
Disposal
of rotten wood dunnage from ONNE yard
|
2017
|
CHEVRON
NIGERIA LIMITED
|
|
Disposal
of rotten wood dunnage from ONNE yard.
Field
calibration abd certification of pressure and
temperature recoeders.
|
2017
|
AOS
ORWELL
|
|
Calibration
of Pressure Transmitter in Pressure Relief Test Bench
Calibration
of Pressure Control Department Pressure Recorders and Gauges
Calibration
and certification of Machine Shop Gauges, Down Hole Tool Gauges and
inspection Air Compressors
Inspection
and Certification of Air Compressors.
Installation
of Electrical control panel, pressure control switch and gauges on
compressors.
Calibration
and recertification of high pressure recorders and gauges in all departments.
Calibration
and Certification of FISHING Gauges
Calibration
and Certification of WIRELINE Gauges.
Calibration
and Certification of MACHINE Gauges.
Calibration
and Certification of Pressure Control Gauges.
|
2017
|
CAKASA
COMPANY NIGERIA
|
|
Pressure
Testing of Flow Laboratory Hoses.
|
2017
|
LTT
OIL & GAS
|
|
Calibration
and certification of Pressure Relief Valves.
Maintenance
of pressure test pumps.
Calibration of pressure recorders and gas
booster pumps.
|
2018
|
AOS
ORWELL
|
|
Calibration
of Pressure Transmitter in Pressure Relief Test Bench
Calibration
of Pressure Control Department Pressure Recorders and Gauges
Calibration
and certification of Machine Shop Gauges, Down Hole Tool Gauges and
inspection Air Compressors
Inspection
and Certification of Air Compressors.
Installation
of Electrical control panel, pressure control switch and gauges on
compressors.
Calibration
and recertification of high pressure recorders and gauges in all departments.
Calibration
and Certification of FISHING Gauges
Calibration
and Certification of WIRELINE Gauges.
Calibration
and Certification of MACHINE Gauges.
Calibration
and Certification of Pressure Control Gauges.
|
2018
|
CAKASA
NIGERIA COMPANY, EROTON NIG LTD.
|
|
Hydro
static Testing and Certification of Alakiri Flowstation fabricated flow lines.
Hydro
static Testing and Certification of Cawthorne
Channel Flowstation fabricated flow lines.
Hydro
static Testing and Certification of Bille Flowstation fabricated flow lines.
|
2018
|
BELL
OIL AND GAS
|
|
Calibration
and Certification of Pressure Control Gauges.
Fabrication
and welding of air ducting flowlines in flow lab.
Commissioning
of the flow lines.
|
2018
|
LEKOIL
NIG. LTD, GREENFIELD ENERGY, OTAKIKPO JV
|
|
Supply
of spare parts for chemical injection pumps
Minor
maintenance activity on Otakikpo marginal field.
|